About this deal
Low machinery and set-up costs invite inexperienced installers, who probably will do a substandard job. If the pot hole or required tarmac is going to be deeper than 30mm, it is advised you lay it in 2 stages, ensure the first layer is compact tightly before laying a second layer on top. Provide a suitable foundation. This step might involve excavation and removal of the current driveway, or if the existing driveway is of good quality, leave it in place. A cookie set by YouTube to measure bandwidth that determines whether the user gets the new or old player interface.
Lay hardcore, followed by gravel/sand ballast into the excavation. Then compress the ballast to provide a firm and stable base of the required depth.
Apply Tarmac
Before any laying of tarmac can begin, first the ground needs to be excavated to the correct depth which is usually 300mm below surface level (excluding any ground anomalies). Edging
This cookie is used by Issuu analytic system to gather information regarding visitor activity on Issuu products. Coverage: Approx 1m2 at 12-15mm compacted, depending on the surface regularity of the reinstatementsPaving, Pointing & Grouting We offer a range of pointing and grouting materials for jointing your patio slabs, outdoor paving or driveway including flowable slurry grouts such as UltraScape Flowpoint, brush-in grouts like EasyJoint and gun injected mortar for fine pointing. As well as supplying paving primer, sealants and paving and driveway cleaners. After the surface has been excavated, a Geotextile woven membrane is laid down. This is to help suppress weed growth and minimise any sinking. It also strengthens the base of the driveway, preparing for use by heavy loads. Layering