276°
Posted 20 hours ago

Scaffold Tube End Caps Pipe Pole Cap for Scaffolding (100)

£9.9£99Clearance
ZTS2023's avatar
Shared by
ZTS2023
Joined in 2023
82
63

About this deal

Prior to installation, the scaffold contractor or scaffold designer can then provide relevant information about the scaffold. This should include:

Erection, alteration and dismantling of all scaffolding structures (basic or complex) should be done under the direct supervision of a competent person. For complex structures this would usually be an 'Advanced Scaffolder' or an individual who has received training in a specific type of system scaffold for the complexity of the configuration involved. Scaffolds which encroach over the highway (including pavements) require a license under Section 169 of the Highways Act 1980, which are issued by the local Highway Authority. Scaffolds should never be erected or dismantled over people or busy pavements. If the work is likely to present a danger to the public, you should consider applying for a footpath or road closure to eliminate the risk of a member of the public being injured. Erection and dismantling should be done inside a segregated area and during times when there are fewer members of the public in the vicinity. Suitable precautions must be taken to prevent falls. General access scaffolds provide a means of working at height while preventing falls and should be provided whenever practicable. Scaffolds must be designed, erected, altered and dismantled only by competent people and the work should be carried out under the direction of a competent supervisor.Trainee scaffolders must always work under the supervision of a trained and competent scaffolder. Operatives are classed as 'trainees' until they have completed the approved training and assessment required to be deemed competent. any scaffold structure not mentioned above that falls outside the 'compliant scaffold' criteria in TG20 or similar guidance from manufacturers of system scaffolds.

Scaffolding operatives should be up to date with the latest changes to safety guidance and good working practices within the scaffolding industry. Giving operatives job specific pre-start briefings and regular toolbox talks is a good way of keeping them informed. details of additional elements such as beamed bridges, fans, loading bays etc, which may be a standard configuration (see note 1) or specifically designed Proprietary system scaffolds must be erected and tied according to the manufacturers’ instructions. All scaffolding must be erected, dismantled and altered in a safe manner. This can be achieved by following NASC's Safety Guidance SG4 'Preventing falls in scaffolding operations'

See also

any specific requirements or provisions eg pedestrian walkway, restriction on tie locations, inclusion/provision for mechanical handling plant eg hoist) maximum working loads to be imposed and maximum number of people using the scaffold at any one time All scaffolding must be erected, dismantled and altered in a safe manner. This can be achieved by following National Access and Scaffolding Confederation (NASC) Safety Guidance SG4 'Preventing falls in scaffolding operations' or by following similar guidance provided by the manufacturers of system scaffolding. The key priority and objective for scaffolders is to establish collective fall protection minimising the time exposed to a fall risk and reliance upon personal fall protection equipment such as safety harnesses and lanyards.

information on the structure/building the scaffold will be erected against together with any relevant dimensions and drawings Theseare a long-term product, which are suited towards the internal protection of a pole. They help to prevent ingress as well as protect from sharp or exposed edges. Produced to fit all industry standard sizes of scaffold pole, these Scaffold End Caps simply push onto the end of a pole. This is without the requirement for adhesives or fixings to keep them in position.

Sort by

All of our Scaffolding Equipmentproducts havebeen created with industry standard sizing in mind, which ensures an ideal fit and feel, as well asto reduce the time you spend measuring. These Scaffold Suppliesare built to last, providinga long-term, cost-effective solution compared to other short term solutions. Employers must provide appropriate levels of supervision taking into account the complexity of the work and the levels of training and competence of the scaffolders involved.

Asda Great Deal

Free UK shipping. 15 day free returns.
Community Updates
*So you can easily identify outgoing links on our site, we've marked them with an "*" symbol. Links on our site are monetised, but this never affects which deals get posted. Find more info in our FAQs and About Us page.
New Comment